Equipment of industry of power of international of the 4th 2008 Anhui reachs pro
From;    Author:Stand originally
Showpiece time: 2008-10-27 comes 2008-10-30
Application ends: 2008-10-25
Periodic:
Establish time:
Exhibit meeting object: Businessman
Exhibit meeting area: Home is exhibited meeting
Exhibit meeting area:
Specific address: Anhui international exhibition center
Showpiece industry:
Ginseng extend range: ◇ of product of ◇ electrical engineering material is metric technology of cable of section of ◇ of plan cost equipment and product ◇ transport technology of technology of transformer of ◇ of distribution technology equipment and technology of nuclear power plant of relevant equipment ◇ and environmental protection of equipment ◇ electric power and automation of equipment ◇ electrified wire netting and fixture ◇ spy high pressure is defeated change firepower of electric technology and equipment ◇
Sponsor square: Company of power of the Anhui province

Undertake square:
Assist do square: Designing institute of electric power of the Anhui province
Limited company of goods and materials of Anhui electric power

Exhibit meeting network address:
Exhibit meeting specification: 2008, the good luck of Anhui electrified wire netting and challenge
What policy of moderately tight macroscopical adjusting control will make our near future runs outstanding achievement and dimensions development is tall in the center of 2008 speed somewhat slow down, but from long-term look, electrified wire netting develops shoulder heavy responsibilities, manage and build an environment to will be improved further, construction of electrified wire netting will be more normative. As power system reform is deepened stage by stage, scientific and sound electrovalency policy and electrovalency mechanism work up, power development and user bear between force, generate electricity between link and link of electrified wire netting concern as a whole more will harmonious.
2008 is the assault fortified positions that 915 ” of “ plan year. According to forecasting, whole society of the Anhui province used n 2008 85.8 billion kilowatt hour, growth makes an appointment with 12.60%; to predict all of put into production moves unit 7.37 million kilowatt, complete province whole society generates electricity by 2008 outfit machine 26.98 million kilowatt (the report that contain Anhui east send aircrew) of 6.68 million kilowatt. Complete province electricenergy production will break through 100 billion kilowatt hour.
During 915 ” of “ , my province will add 500 kilovolt newly to change 13 million kilovolt installs capacitance and line and 3167 kilometers, 220 kilovolt change 19.05 million kilovolt installs capacitance and line and 4179 kilometers, 110 kilovolt change 1212 kilovolt install capacitance and line and 4920 kilometers. To the end of 2010, dimensions of 500 kilovolt electrified wire netting achieves Anhui 18.1 million thousand volt-ampere and dimensions of electrified wire netting of kilovolt of 4299 kilometers;220 achieve 33.57 million thousand volt-ampere and dimensions of electrified wire netting of kilovolt of 10377 kilometers;110 to achieve 26.32 million kilovolt how to be mixed 12739 kilometers.